Skip Navigation

This table is used for column layout.

Link to Home Page
Town Resources
Quick Links



Highway Division
Contact TypeContact Information
Contact:
DPW Director
Address:
66 River Road
Wayland, MA 01778
Phone:
(508) 358-3672
Fax:
(508) 358-4082
Service Requests:
(508) 358-3672
Hours:
Monday - Friday 7:00 4:00
Photo
 
Additional Links:
Link to PageLink to PageLink to Page

PUBLIC HEARING NOTICE

A Public Road Layout Hearing concerning Dylan’s Circle, Spencer Circle, and Summer Lane will be held with the Wayland Board of Public Works at 8:00 PM on Tuesday, January 31, 2017 at the DPW Facility, 66 River Road.  This hearing is in response to the Planning Board’s proposed submission of an article at 2017 Annual Town Meeting to accept the above streets as Town ways.

Additional information may be found here

Questions may be directed to the DPW (508) 358-3672 or the Planning Dept (508) 358-3778.


TOWN CONSTRUCTION UPDATE

FIVE PATHS (OLD CONNECTICUT PATH & COCHITUATE ROAD) INTERSECTION
5 Paths.jpg
Upgrades to the Five Paths intersection are currently underway.  In-road construction will be minimal – the project will primarily consist of an upgrade to the traffic signals and pedestrian crossings.  During construction, motorists may experience minor delays at times.

ROUTE 27 & 30 INTERSECTION
27 & 30.jpg
Upgrades to the intersection of Route 27 and Route 30 are currently underway.  This project is being completed by Newport Construction under the direction of MassDOT, and is scheduled to occur in phases over the next 18 months.  Every effort will be made by the State to minimize traffic disruption, including performing work at night when needed.  During this project, please anticipate delays and follow all construction signage as well as the direction of on-site police officers.  Please direct any questions regarding this project to MassDOT at 877-623-6846.


COCHITUATE GAS MAIN INSTALLATION
National Grid will be installing new gas lines on several streets in Cochituate.  This project is being completed by Neuco Construction under the direction of National Grid, and is scheduled to occur over the next 9 weeks.  The contractor is scheduled to begin work on Shawmut Avenue, followed by Harrison Street, then Bradford Street; with construction on each road scheduled to last 2-3 weeks.  Resident access will be maintained throughout the project, but please drive with caution and follow the direction of on-site police officers.  Please direct any questions regarding this project to National Grid at 1-800-233-5325.

COCHITUATE WATER MAIN REPLACEMENT
Utilizing C.C. Construction as contractor, the Town will be replacing water main on Main Street between Damon Street and East/West Plain Street as well as on Bradford Street, Shawmut Avenue, and Harrison Street.  Work is scheduled to commence within the next week.  Every effort will be made to minimize traffic disruptions, including the completion of work on the Main Street portion between 7:00pm and 5:00am.


We appreciate the understanding of residents as the Town of Wayland, State of Massachusetts, and Utility Companies coordinate our efforts to take advantage of the construction season to complete these necessary infrastructure improvements.  For continued status updates, please follow the DPW’s Facebook page at https://www.facebook.com/WaylandDPW/.


Photo of Wayland
Town of Wayland    41 Cochituate Road, Wayland, MA 01778-2614    Tel: (508) 358-7701    FAX: (508) 358-3627
Website Disclaimer & Privacy Policy        Virtual Towns & Schools Website