MWRA Connection Information
In April of 2021 as part of an effort to identify a long term drinking water supply, the Town performed an evaluation to study the feasibility and costs associated with connecting to the MWRA as a drinking water supply.. Documents from this study will be linked on this page.
- Wayland MWRA Connection Phase 1 Schedule 1-16-24
- Presentation to Select Board Slide Deck January 23, 2023
- Presentation to Board of Public Works Slide Deck January 4, 2023
- Water Supply Alternatives Analysis Report April 28, 2022
- Supply Study Progress Meeting Slide Deck December 21, 2021
- Supply Study Progress Meeting Slide Deck August 17,2021